Encuentro Beach development will provide the design and construction of the infrastructure to the property boundary of each parcel to be developed
INFRASTRUCTURE TO BE DEVELOPED:
- Roadway and Pedestrian walkways to allow access to each parcel within the overall development
- Main arrival/guardhouse and arrival feature for the overall development.
- Potable water to the outside of the property limit at the entrance of each parcel, as well as fire hydrants and drainage basins for the surface drainage for collection of the overall development common areas
- Electric and telephone distribution systems to the outside of the property limit at the entrance of each parcel
- Trash removal will be provided by the Master Developer from each parcel in centralized locations. Sub-Developers are responsible for trash removal within the parcels to these locations, including trash generated from construction which will be the responsibility of Sub-Developers
- The Master Developer will set up a Master Condominium/Neighborhood Association for the Encuentro Beach Cabarete Development to control all development and administration within the community.
- The Master Condominium/Neighborhood Association will be responsible of maintaining all common areas, main arrivals and separation/buffer zones.
- In addition to the basic infrastructure the Master Developer will construct a Beach Club with parking for the use of all EBC residents that will provide access to the beach for residents of subdivisions that are not located on ocean front parcels. A sports recreation area with tennis courts and a Heliport will also be built.
ZONING REGULATIONS
The Tourist Land Management Plan (POTT) of the Municipal District of Cabarete, prepared by the Secretary of State for Tourism, set a territorial categorization Encuentro Beach Cabarete Development is part of the Environmental Unit No. 5 (New Centrality).
EBC will enjoy one of the few allowance in the Cabarete area that has a of maximum height of 5 levels recessed as provided in the regulations governing the implementation of the plan equivalent to 17.50 lineal meters in height and a minimum height of up to 4 levels, equivalent to 14.50 mt. high.